- 基本释义
- 行业释义
- 英英释义
- 更多资料
- 1. 费用增加率,成本增高率
网络例句
以下结果来自互联网
- The Secretary for Works is responsible for the cost-effective delivery of public works projects and for the formulation of policies on flood control, construction site safety, slope safety and water supply.

工务局局长负责确保各项公共工程计划的进行,均能符合成本效益,以及制定防洪、建筑地盘安全、斜坡安全和供水政策。 - The Secretary for Works is responsible for the delivery of public works projects in a cost-effective manner, and the formulation of policies on slope safety, water supply, flood control and construction site safety.

工务局局长负责确保各项工务工程的推行均符合成本效益,以及制定斜坡安全、供水、防洪和建筑地盘安全等政策。 - Ease down a slope

沿斜坡徐徐下降 - gravitational processes on slope

斜坡重力作用 - A steep downward slope.

陡斜向下倾斜的陡坡
